It would be very helpful to have a Start of week parameter on the Reporting tool to address this situation.
I'm assuming there's no way to do this today (v2.60) other than changing the global Work Week value back and forth.
Thanks.
--Tony
Copyright 1997-2008 MAG Softwrx, Inc. All rights reserved.